Difference between revisions of "CTSC:ARRA.011111"

From NAMIC Wiki
Jump to: navigation, search
(Created page with 'Back to CTSC:ARRA supplement <br> '''Agenda''' * Update on Phase 3 and Phase 4 mi2b2 software * Clinical Utility of mi2b2 functions <br> == Harvard Catalyst Medical Infor…')
 
Line 17: Line 17:
 
* Charles McGow
 
* Charles McGow
 
* Yong Gao
 
* Yong Gao
 +
* Dave Wang
 +
* Bill Tellier
 +
* Bill Hanlon
 +
* Mark Anderson (phone)
 +
 +
 +
=== Update on Phase 3 and Phase 4 mi2b2 software/hardware ===
 +
 +
* Phase 4 development, progress are made. Getting MGH machine up and running. Install windows 2008, 64 bits version. Using java to decompress images before putting them in the repository, seems not to be working on the 64 bits version. Issue: studies with large number of images, not getting all images back (above 2000 no additional images are downloaded), Darren checked that the images were all there so the problem is on the mi2b2 end. Darren is working with the PACS team to resolve the problem. The same case (large studies) will be tried at BWH to see if the same problem occurred.
 +
 +
* Able to get some images to Vincent and Randy who are working on them. Bill sent them through the laptop, not through the new server, it might be useful to try it to make sure the server is working fine. Performance was not outstanding, the new server should improve that.
 +
 +
* Dave has been working to streamline the UI on the client filtering side and the image viewer.
 +
 +
* Jesse working on the BIDMC machine.
  
* Steve Pieper
+
=== mi2b2 in-progress demo===
* Alex Zeitsev
 
* Jesse Wei
 
* Wendy Plesniak (phone)
 
* Mark Anderson (phone)
 
* Bill Hanlon (phone)
 
  
Update
+
* Dave presented the video: client-side filter, download manager and image controls.

Revision as of 15:44, 11 January 2011

Home < CTSC:ARRA.011111

Back to CTSC:ARRA supplement

Agenda

  • Update on Phase 3 and Phase 4 mi2b2 software
  • Clinical Utility of mi2b2 functions


Harvard Catalyst Medical Informatics group Meeting Minutes January 11, 2011

In attendance:

  • Valerie Humblet
  • Bill Wang
  • Chris Herrick
  • Vincent Roch
  • Darren Sack
  • Charles McGow
  • Yong Gao
  • Dave Wang
  • Bill Tellier
  • Bill Hanlon
  • Mark Anderson (phone)


Update on Phase 3 and Phase 4 mi2b2 software/hardware

  • Phase 4 development, progress are made. Getting MGH machine up and running. Install windows 2008, 64 bits version. Using java to decompress images before putting them in the repository, seems not to be working on the 64 bits version. Issue: studies with large number of images, not getting all images back (above 2000 no additional images are downloaded), Darren checked that the images were all there so the problem is on the mi2b2 end. Darren is working with the PACS team to resolve the problem. The same case (large studies) will be tried at BWH to see if the same problem occurred.
  • Able to get some images to Vincent and Randy who are working on them. Bill sent them through the laptop, not through the new server, it might be useful to try it to make sure the server is working fine. Performance was not outstanding, the new server should improve that.
  • Dave has been working to streamline the UI on the client filtering side and the image viewer.
  • Jesse working on the BIDMC machine.

mi2b2 in-progress demo

  • Dave presented the video: client-side filter, download manager and image controls.