October 08 2009 Meeting: VT-NAMIC Revised atlas construction workflow

From NAMIC Wiki
Revision as of 19:22, 8 October 2009 by Fedorov (talk | contribs)
Jump to: navigation, search
Home < October 08 2009 Meeting: VT-NAMIC Revised atlas construction workflow

TODOs

  • link the software tools and scripts with the workflow
  • prepare a branch in the sandbox with the tools not available in Slicer (confirm with Chris copyright issues)


Software

  • Slicer/extensions versioning

Workflow

  1. Prepare the data using the instructions -- LINK
  2. Gradient anisotropic diffusion -- PARAMETERS
  3. BRAINSFit initial registration -- PARAMETERS -- failure to recover the pose for Hugo and Valentino
  4. Manual pose alignment for Hugo and Valentino