Difference between revisions of "OsteoPlan"

From NAMIC Wiki
Jump to: navigation, search
Line 29: Line 29:
 
*BatchMake
 
*BatchMake
 
*KWWidgets
 
*KWWidgets
 +
 +
  
 
==Options available==
 
==Options available==
Line 43: Line 45:
 
----
 
----
 
* Use or create widget to move clipped parts
 
* Use or create widget to move clipped parts
 +
 +
  
 
==Tasklist==
 
==Tasklist==
Line 50: Line 54:
 
----
 
----
 
*Fix toggle visibility of vtkMRMLModelNode created from polydata
 
*Fix toggle visibility of vtkMRMLModelNode created from polydata
** ''Status''
+
** ''Status'': Pending
***Pending
+
 
 +
 
  
 
==Screenshots==
 
==Screenshots==
Line 63: Line 68:
 
</gallery>
 
</gallery>
 
</center>
 
</center>
 +
 +
  
 
==Meetings==
 
==Meetings==

Revision as of 05:39, 10 February 2011

Home < OsteoPlan

The OsteoPlan project consist in porting OsteoPlan module from Slicer 2.6 to Slicer 3.6.
Need VTK 5.7 at least to use vtkClipClosedSurface function.

PSI

Features


  • Type: Extension
  • Language: C++
  • Developed OS: Ubuntu Maverick Meerkat (10.10)
  • Compile on: Linux x86_64 / Windows 7 (x86)
  • Run on: Slicer 3.6.3 trunk (only version tested)
  • Starting Date: January, 4th
  • Expected Deadline: April ?
  • Developer: Laurent Chauvin
  • For: PSI

Librairies

  • Python 3.1.3
  • CMake 2.8.3
  • ITK 3.20.0
  • VTK 5.7
  • Itcl 3.4b1
  • Tk 8.5.9
  • Tcl 8.5.9
  • OpenIGTLink 2.0
  • cmcurl 4.2
  • Teem
  • BatchMake
  • KWWidgets


Options available


  • Toggling a cutter (vtkBoxWidget2 for now, should change)
  • Multiple clipping (change for boolean or something else ?)
  • Move clipped part through transformation node (vtkMRMLLinearTransformNode)

Under development


  • Use other method than clipping to cut model (vtkClipClosedSurface, vtkImplicitBoolean, vtkExtractPolyDataGeometry)

To develop


  • Use or create widget to move clipped parts


Tasklist


Bugfix


  • Fix toggle visibility of vtkMRMLModelNode created from polydata
    • Status: Pending


Screenshots



Meetings


  • MGH, Boston: January, 5th.
  • PSI, Andover: January, 27th. Waban Station, 11:30.
  • PSI, Andover: February, 10th. Newton Center Station, 8:45am.