AHM 2007 Schedule Test
From NAMIC Wiki
Home < AHM 2007 Schedule Test
cell1 | cell2 | cell3 |
Wednesday | Thursday | Friday | |
7:30a-8:00a Breakfast | Breakfast | Breakfast |
This is a draft of the agenda for the AHM.
Contents
Wednesday, Jan 10 2007:Project Activities
- 8:00-9:00 - Breakfast
- 9:00-11:00 - Slicer3 Tutorial (Steve Pieper, Jim Miller)
- 11:00-12:00 - Slicer3 Developer Feedback: How IGT, DTI, and EM groups are using Slicer3 (Brad Davis, Kilian Pohl, Lauren O'Donnell, Raul San Jose)
- 12:00-1:00 - Lunch
- 1:00-2:00 - Project Introductions (Jim Miller to Lead)
- 2:00-5:30 - Project Work (with Coffee Break at 15:30)
- 2:00-3:00 - Breakout Session: EM Segmentation Tutorial (Kilian Pohl, Brad Davis)
- 5:30-7:30 - Mid Cycle Review with Core 1&2 Site PIs
Thursday, Jan 11 2007: One-day AHM
Morning: Updates on On-going Projects, (aka 'goodbye for the current DBP's')
- 07.30-08.00: Breakfast
- 08.00-08.30: Introduction and Adminstrative Update (Ron)
- 08.30-09.00: NA-MIC Kit Update (Bill)
- 09.00-09.15: discussion (led by Guido Gerig)
- 09.15-09.45: DTI Theme Update (Ross Whitaker)
- 09.45-10.00: discussion (led by Marty Shenton)
- 10.00-10.30: Break
- 10.30-11.00: Structural Analysis Theme Update (Martin Styner)
- 11.00-11.15: discussion (led by Allen Tannenbaum)
- 11.15-11.30: fMRI Theme Update (Polina Golland)
- 11.30-11.45: discussion (led by Andy Saykin)
- 11.45-12.15: Outreach, Training (Randy)
- 12.15-01.15: Lunch break
Afternoon: The new DBP's: Projects and plans
- 1.15-1.45: Harvard: VCFS as a genetic model for schizophrenia (M. Kubicki)
- 1.45-2.00: discussion
- 2.00-2.20: JHU: Image guided prostate interventions (G. Fichtinger)
- 2.20-2.35: discussion
- 2.35-2.55: The Mind Institute: Vascular Components of Brain Disorders (J. Bockholt)
- 2.55-3.10: discussion
- 3.10-3.30: UNC: Longitudinal MRI study of early brain development (H. Cody)
- 3.30-3.45: discussion
- 3.45-4.00: Outreach, Training, conclusion (Ron)
- 4.00-4.15: UIowa Collaboration Grant (N. Grosland, V. Magnotta)
- 4.15-4.30: XIP: Open source application development environment in caBIG (F. Prior, EAB)
- 4.30-5.00: discussion (Ron, Ross, Bill)
- 5.00-5.30: NIH Lead Q&A (G. Peng, M. Ackerman)
Friday, Jan 12 2007: 08.00am-12.00 2007 EAB
Friday, Jan 12 2007: Project Activities
- 7:30-8:00 Breakfast
- 8:00-12:00 Project Work
- 10:30-11:00 Coffee Break
- 12:00-13:00 Lunch
- 13:00-15:00 Project Work
- 15:00pm Adjourn