Difference between revisions of "2008 IGT Project Week Prostate Breakout Session"

From NAMIC Wiki
Jump to: navigation, search
Line 39: Line 39:
  
 
==Robot Control==
 
==Robot Control==
*robot control from Slicer
+
*robot control from Slicer (POSITION CLEAR, Work for TUESDAY)
*robot control from RadVision
+
*robot control from RadVision (POSITION CLEAR,  for TUESDAY)
  
 
==Device placement==
 
==Device placement==
 
*Needle  
 
*Needle  
 
*Seeds
 
*Seeds

Revision as of 21:00, 8 December 2008

Home < 2008 IGT Project Week Prostate Breakout Session

Back to 2008 IGT Project Week

Moderator:

  • Noby Hata

Attendees:


Agenda:

  • Final walk through of the steps

Setup

    • Power supply
    • Cable (Eithernet, power)
    • Robot and the associated computers
    • MRI
    • Slicer and associated computers
    • Radvision
    • network (IP address?)
    • compresso (connector needs to be checked ?)
    • monitor (how many, where?) (needs one from Monitor)
    • phantom
    • Coil

Localiser

  • Image transfer (DICOM OK)
  • Z-frame and calibration (Jack was able to get good registration.
  • Open IGT Link image transfer (Tonight, may continue to tomorrow)
  • transferring calibration result (open igt link CLEAR)

Planning

  • Planning in Slicer (based DICOM, clear, CLEAR)
  • Planning in RadVision

Scan Control

  • Scan control from Slicer
  • Scan control from Radvision

Robot Control

  • robot control from Slicer (POSITION CLEAR, Work for TUESDAY)
  • robot control from RadVision (POSITION CLEAR, for TUESDAY)

Device placement

  • Needle
  • Seeds